MOD must stick to IDDM for Light Tank Procurement

Indian Light Tank Zorawar in Ladakh December 2024
Indian Light Tank Zorawar in Ladakh December 2024

Ministry of Defence maybe violating own norms of giving highest priority to an Indian Designed and Developed and Manufactured Light Tank - the Zorawar introducing a hybrid Russian Sprut. Strange are the ways of bureacracy in South Block.


Even as the DRDO designed and L & T developed Indian Light Tank (ILT) achieved milestone by firing a number of rounds at different ranges at an altitude of more than 4200m, at a High Altitude Location with consistently accurate results in December last year, the Ministry of Defence has thrown a spanner in the works so to say for fast completion of the Army  essential Operational requirement with State-owned Armoured Vehicles Nigam Limited (AVNL) partnering with Russian defence firms Rosoboronexport (ROE) and High Precision Systems (HPC) for a modified version of the 2S25 Sprut-SD light tank for the Indian Army


The Army has already carried out Phase I trial in desert environment in September 2024.

This light tank has been defined, designed and developed by Combat Vehicles Research & Development Establishment, the Chennai-based laboratory of Defence Research and Development Organisation (DRDO) against the Provisional Staff Qualitative Requirements of Indian Army.


While the HVF Avadi which works under the AVNL was provided the RFI and RFP the Sprut will not fall in the IDDM category which is the first priority for procurement an agency whiich has a product that is Indian Designed and Developed and Manufactured.


If competition is the logic than there has to be a domestic rather than a foreign designed and developed tank as the Sprut at best a self propelled anti tank gun with low armour protection with dated technology. Upgrades made will not match the originals designed and developed by the DRDO which has already passed muster much lauded by the Defence Minister Mr Rajnath Singh


While competition in development of defence weapons systems is a norm it is based on design and development by two competing companies for eg Lockheed Martin and Boeing which were in the race of F 47 advanced fighter programme of the US Airforce, one by the latter.


Competition between a domestically developed tank and a hybrid concoction of Sprut 2825 cannot be seen as fair or even viable.


The Ministry of Defence will have a lot of explanation to do as this will also defeat the very objective of Atma Nirbharata in Defence.


Background To Light Tanks for Indian Army


The necessity for a light tank for the Indian Army was anticipated some years back, however the proposal after some preliminary moves for development through the Defence Research and Development Organisation (DRDO) in the 1990’s did not take off possibly due to shifting priorities.


The long standoff in Eastern Ladakh that has continued since May 2020 saw the People’s Liberation Army (PLA) deploying light tanks.


In response the Indian Army had in place and moved T 72 and T 90 medium tanks. These were found unsuitable in the some areas which lacked the deployability and possibly operational requirements led for the proposal for procurement of light tanks was revived.


The Indian Army issued a Request for Information (RFI) the primary objective of which is to assist the service HQ in formulation of the Service QRs to enable practical evolution of either and Expression of Intent (EOI) and Request for Proposal. This also assists in estimation of the budgetary cost as is indicated in the Defence Acquisition Procedure (DAP) 2020.


The RFI denotes that the Army intends to acquire approximately 350 Light Tanks in a phased manner planned to be procured under the “ ‘Make-in-India’ ethos and spirit of the DAP – 2020”.


This denotes that the intent is to outline the SQRs for acquisition under the Make category of DAP 2020.


The DAP relevant section on the issue states that, “In line with the Government’s ‘Make in India’ programme, several initiatives have been taken in the recent years to build a robust defence industrial ecosystem capable of meeting existing and future requirements of the Armed Forces. The emerging dynamism of the Indian industry needs to be gainfully utilised to build domestic capabilities for designing, developing and manufacturing state of the art defence equipment”.


There are a number of options for procurement under this proposal.


Make 1 Category


Under the Make I category design and development of major platforms is undertaken. As per DAP 2020, Make-I (Government Funded) projects involving design and development of equipment, systems, major platforms or upgrades will be undertaken where the, “MoD will provide financial support up to 70% of prototype development cost or maximum “.


DRDO Developed


The other option is to progress the development through the DRDO/DPSU/OFB [corporatized in the near future], These cases would be categorised as ‘Buy (Indian-IDDM)’ for subsequent procurement from the industry partner of DRDO or DPSU/OFB.


The lead time required for procurement through these means will be around five to seven years.


On the other hand, the requirement is for the Army to acquire the light tanks urgently due to the operational requirements.


Buy and Manufacture in India


Towards this end the proposal could envisage acquisition through the Buy (Global - Manufacture in India) route resulting in “ outright purchase of equipment from foreign vendors, in quantities as considered necessary, followed by indigenous manufacture of the entire/part of the equipment and spares/assemblies/sub-assemblies/Maintenance along with Repair and Overhaul (MRO) facility etc”. The indigenous content has to be 50% IC on cost basis of the Base Contract Price.


At present there are essentially three light tanks which are globally on the manufacturing stream – the Russian Sprut-SDM1, South Korean Hanwa K21-105 and the Israel Elbit systems ASCOD 2 Sabrah.


Of these the Russian Sprut is the classic light tank with a 125 mm gun which may be suited for the operational role desired in Eastern Ladakh but is a dated armoured vehicle with light protection.


Conclusion


Given operational requirement of deploying of light tanks some of the possible options that can be considered post the RFI stage by the Indian Army are discussed herein. An early consideration of the proposals received is essential before the proposal goes into the usual loop of procurement officialdom bane of Army acquisitions in the recent past.


Comments


Join our mailing list for updates on publications and events

Thanks for submitting!

2196, B 2, Near Muskaan School Vasant Kunj New Delhi 110070

+91-9899692368

© 2023 by Security-Risks, Designed & Developed by Inkryptis Design Studio

bottom of page